Startseite

  Downloads

  Weblinks

  Kontakt

MBB Mineral Processing - Dipl.-Ing. Thomas Pfeuti - Bahnhofstraße 13E - D-25469 Halstenbek - Tel. +49- (0)4101-3983955

 

Startseite
Produkte
Consulting
Downloads
Über uns
Impressum
Barrierefrei
 

mbb12

mbb Separation > Produkte > Entwicklungsgeschichte > mbb12

Drucken  


Vertical Jig mbb 12 at TerraCon GmbH in Hamburg / Germany

anlage
Gesamtansicht

This machine mbb 12 ( Size VS 300 ) has been working since 10.11.2008 at TerraCon GmbH in D-20539 Hamburg, Hovestr. 74 (Northern Germany).

The duty is the separation of organics out of contaminated soil 0 – 30 mm. The system is also suitable for the separation of sewage sand or sweeping dust into mineral and organic solids fractions.
Input is 10 - 20 t/h at an organic content from 30 up to 80 % .

The plant uses three polyurethane lined pumps each delivering 80 m³/h and has a total
power consumption of 197 kW incl. pumps, screens, conveyor belts and sludge dewatering.
The input is supplied via shovel loader and conveyor belts direct into the Vertical Jig. The TOC in the mineral fractions, both coarse (Underflow Vertical Jig) and fine ( cyclone sand ), is reliably < 3 %. Both cyclones are 10” Mozley with a hydraulic capacity of 80 m³/h
each.


By switching alternatively from cyclone 1 to 2 it is possible to route the cyclone sand underflow separately to dewatering screen 2, resulting in a coarser mineral product from dewatering screen 1 which has improved draining characteristics.

By opposite switching the mineral product’s compaction characteristics are improved, making
it better suited for use as hardcore or infill material in civil engineering and road construction..











umschaltweiche
Switch for 2 cyclones with pneumatic valves

aufgabebunker
Feed hopper and conveyorbelts

sortierschlauch
Sorting hose with agitator unit

entwaesserungssieb
Dewateringscreen 2 for cyclonesand

produkthalde
Mineralic product box ( Underflow Vertical Jig )
zyklonsand
Cyclonesand ( fine mineralics )
organic
Organics ( Overflow Vertical Jig )
zyklonunterlauf
Underflow from cyclone 2 on dewateringscreen 2 ( while shutting down the plant )

Production:
mbb GmbH & Co KG am Königshügel D-24884 Selk

Contact:
Dipl.-Ing. Michael Braeumer
Engineering Buerau for Mineral Processing Gartenstr.20
D-25557 Bendorf Tel (++49) 48 72 – 94 20 91 Fax 94 20 92 mobile: (0)173 - 2 01 49 28


Informations about the processing plant:
www.terracon-hamburg.de





Website erstellt von Wellmann IT 2012 - A.Wellmann